EV Charging Guides

📚 Technical Guides · UK EV Charging · BS 7671

EV Charging Guides

Everything you need to understand UK EV charging — from PME protection and BS 7671 compliance, to choosing between charger models, upgrading existing units, and specifying the right protection devices. Written for homeowners, installers, and OEMs.

15 guides · Regularly updated
🧠 Expert knowledge since 2012
🧠Expert technical advice since 2012 💷Competitive trade prices 📦Volume & OEM discounts 🚚Fast UK dispatch
Shop All Products →
Who these guides are for

Homeowners — plain English explanations of what PME is, whether you need an earth rod, and how to choose the right charger for your home. Installers & electricians — deep technical detail on BS 7671 Section 722, protection device selection, and compliance routes. OEMs & developers — EPC controller architecture, modular system design, and volume supply information.

🏠 Homeowner — I want plain English
🔨 Installer — I need the technical detail
🏭 OEM / Developer — I’m building systems
🛒

Ready to buy? EcoHarmony stocks everything covered in these guides

From fully assembled WCED PME boards and Simpson & Partners chargers to EPC controllers and three-phase distribution boards — all UK-stocked, all at competitive trade pricing.

  • 💷 Competitive pricing — volume discounts from 5+ units for installers and OEMs
  • 🚚 Fast UK dispatch — same-day on stock lines
  • 🧠 Expert advice — we’ll help you specify the right product for your scenario

Shop by Product Category

Integrated PME protection · 7kW & 22kW

Simpson & Partners EV Chargers

Built-in PEN fault detection, right-to-repair design, Octopus smart tariff support. No earth rod, no external WCED board on PME supplies. Basic and Plus ranges.

Shop Simpson & Partners →
PME + RCBO + SPD · Single-phase

Single-Phase WCED PME Boards

Fully assembled external PME protection for any standard EV charger on a TN-C-S supply. Includes all required protection layers pre-built and tested.

Shop WCED Boards →
22kW · Three-phase

Three-Phase WCED Boards

Three-phase PME protection + RCBOs + SPD for 22kW commercial and high-power domestic EV charging installations.

Shop 3-Phase Boards →
Retrofit · Smart features · OCPP

EPC Controllers

EVSE Protocol Controllers for retrofit upgrades and new build. Add app control, load balancing, and smart tariff support to existing charger enclosures.

Shop EPC Controllers →

Quick Reference — Common Questions

Question Short answer Full guide
Does my UK home have a PME supply? Probably yes — ~80% do What is PME? →
Do I need an earth rod for my EV charger? Usually no — modern protection devices replace them Earth Rod Guide →
What is a WCED board? PME protection + RCBO + SPD in one unit WCED Explained →
Does an RCBO provide PME protection? No — different fault type entirely Protection Layers →
Do Simpson & Partners chargers need a WCED board? No — protection is built in S&P PME Guide →
Basic vs Plus — which should I choose? Plus if you have solar; Basic for standard charging Buyer Guide →
Can I upgrade my old charger instead of replacing it? Usually yes — replace the control system only Upgrade Guide →
What is an EPC controller? The brain of an EV charger — the part that gets outdated EPC Guide →
Can I upgrade a Rolec charger without replacing it? Yes — retrofit an EPC controller Rolec Upgrade →
What PME protection does a Tesla Wall Connector need? Same as any other EV charger — 3-phase PME board on a 3-phase supply Tesla Guide →
What RCBO do I need for a 3-phase EV charger? 40A Type A RCBO — one per charger circuit 3-Phase Guide →
Can I use a Type A RCD on a heat pump? No — heat pumps require Type B minimum Heat Pump Guide →

Not sure where to start?

Tell us your supply type, charger brand, and what you’re trying to achieve — we’ll point you to the right guide and the right product.

EcoHarmony EV Charging Expert advice · Competitive prices · Fast UK dispatch