
Three-phase PEN + RCBO + surge unit
Review the fitted protection option and confirm the chosen configuration against the charger specification.
View options & prices →WCED • Electrical protection & switching
Source WCED protection and distribution equipment for workplace, fleet and shared-site EV charging projects. Select equipment around the charger specifications, supply arrangement and number of circuits; the protection board is one part of the wider charging-system design.
Open a product to select its exact configuration and see current prices and availability.

Review the fitted protection option and confirm the chosen configuration against the charger specification.
View options & prices →
Compare the configurations on the Tesla-compatible product listing and check exactly which devices are included.
View options & prices →
Explore the listed RCBO and surge-protection unit where separate PEN protection is not part of this assembly.
View options & prices →
Plan outgoing circuits using a TPN board and its specified compatible protective devices.
View options & prices →Confirm supply type, available capacity, earthing arrangement, charger models and the number of charging circuits.
Review residual-current, overcurrent, surge and open-PEN requirements separately, taking account of protection already provided by the charger.
Agree demand management, metering, access and billing separately from the protection board. Do not assume a board includes charger software or a billing service.
Our consumer-unit builder lets you choose single-phase or three-phase, select an enclosure and track the spare DIN space as you add supported components. Custom selections are supplied separately; factory-configured units have their own stated contents.
Build your own consumer unit →Not unless the selected product explicitly lists it. A main switch and SPD do not provide PEN fault detection.
No. An SPD addresses transient overvoltages; PEN fault protection addresses a different supply fault condition.
No. Access control, payment processing and charger management depend on the charging equipment and any connected services.
Send charger make and model, circuit count, phase, design current, mounting location and the required protection specification. Include any existing board or device part codes.
Get more detail before choosing a configuration.
Product selection guidance from EcoHarmony. Check the exact product datasheet and manufacturer instructions for the chosen configuration.
A different set of guides each time you visit — covering troubleshooting, buying advice, technical explainers, and more.