Simpson & Partners vs
Andersen A2
The Simpson & Partners Home Series and the Andersen A2 are both premium EV chargers designed for residential installations in the UK.
At first glance, they offer a similar high-end proposition — smart charging capability, solar integration, and refined design suitable for modern homes.
However, they are built around different engineering and design philosophies.
Simpson & Partners is designed as a complete home energy platform, combining premium build quality with advanced connectivity, intelligent load management, and industry-leading software integration. It is also positioned to deliver stronger overall system value, offering a lower entry point into a fully featured smart charging ecosystem without compromising on design or performance.
The Andersen A2, by contrast, is primarily a design-led solution, focusing on minimalist aesthetics and integrated cable storage, with a more traditional feature set and fewer system-wide integration options.
This guide breaks down the real-world differences that matter when choosing between them — including design, installation flexibility, smart functionality, and long-term energy performance.
Gallery
-
Simpson & Partners
-
Anderson A2
KEY DIFFERENCES
Simpson & Partners
Core advantages
Core advantages
- Ethernet + Wi-Fi connectivity
→ More stable, more reliable, and essential for consistent performance (especially in garages or outdoor installs) - OCPP 1.6J+ support
→ Enables integration with third-party platforms, future energy tariffs, and smarter charging control - Future-ready architecture
→ Designed to work with evolving technologies like smart grids and energy management systems - Flexible installation (wall or freestanding)
→ Not restricted by property layout - IK10 impact protection
→ Built to handle real-world use, not just indoor conditions - 10-year enclosure warranty
→ Reflects long-term build quality and manufacturer confidence
👉 Simpson & Partners is built as a complete charging system, not just a wall-mounted appliance.
KEY DIFFERENCES
Andersen
Core advantages
Core advantages
- Integrated cable management
→ Keeps the installation visually clean and uncluttered - Strong emphasis on minimalist, architectural design
- Simplified feature set
→ Easier to use, but with fewer advanced capabilities
👉 The A2 is designed to blend into your home visually, but offers less flexibility as your needs evolve.
FEATURE BREAKDOWN
Simpson & Partners
Smart Features
Smart Features
Offers advanced smart capabilities including OCPP support, enabling integration with third-party systems and future commercial platforms.
Also includes:
- Solar integration
- Dynamic load balancing
- Smart app control
- V2G upgradeability
Installation & Electrical
Installation & Electrical
Supports both single-phase and three-phase charging, making it suitable for a wide range of installations, including future upgrades.
Each unit includes integrated:
- PEN fault protection
- RCD protection
- PME compliance
In most UK installations, this means the charger can be installed using a dedicated RCBO-protected circuit, often alongside a surge protection device (SPD) where required.
Simpson & Partners also includes Ethernet connectivity, offering more stable communication than Wi-Fi alone — particularly important for smart scheduling and updates.
Access & Billing
Access & Billing
Home models focus on private use, with advanced billing features available in other ranges (holiday/commercial).
Hardware & Format
Hardware & Format
Simpson & Partners
- Wall-mounted and freestanding options available
- Tethered or socketed
- IP54+ rated
- IK10 impact resistance
Design & User Experience
Design & User Experience
A clear leader in design, offering:
- Over 100 colour combinations
- Premium aluminium and wood finishes
- Integrated ambient lighting
Designed to complement high-end homes and architectural spaces.
Commercial Features
Commercial Features
Offers scalable solutions across:
- Business charging
- Multi-site setups
- Revenue generation
FEATURE BREAKDOWN
Andersen
Smart Features
Smart Features
Includes:
- Built-in protection systems
- Wi-Fi connectivity (no Ethernet)
👉 Installation is straightforward, but less flexible and less connected than Simpson
Installation & Electrical
Installation & Electrical
Designed primarily for single-phase residential installations, making it a straightforward choice for most UK homes.
It includes built-in safety protections such as:
- PEN fault protection
- RCD protection
Like most EV chargers, installation typically requires a dedicated RCBO-protected circuit, with an SPD recommended or required depending on the installation setup.
Access & Billing
Access & Billing
- Designed for private residential use only
- No RFID, billing, or guest charging features
👉 Not suitable for rentals or commercial use
Hardware & Format
Hardware & Format
- Primarily wall-mounted
- Tethered design with hidden cable storage
- IP-rated but lower impact resistance than Simpson
Design & User Experience
Design & User Experience
Known for minimalist, clean design
Interchangeable front panels
Hidden cable system (major selling point)
Commercial Features
Commercial Features
No commercial or billing functionality
Strictly residential use
💡 Installation Note
Most EV chargers in the UK require a dedicated circuit with appropriate protection. While many modern chargers include built-in safety features, installers will typically still specify an RCBO and, in many cases, surge protection (SPD) to ensure compliance and long-term reliability.
EXPERT INSIGHT
The Andersen A2 is one of the most premium and customisable EV chargers on the market, particularly focused on hidden cable systems and high-end finishes.
However, this level of design complexity often comes with increased installation considerations and a more fixed ecosystem approach.
Simpson & Partners takes a more modular approach, prioritising flexibility across different electrical setups, mounting options, and future energy system compatibility.
The key difference is philosophy:
Andersen A2 is built as a design statement.
Simpson & Partners is built as a scalable energy platform that also looks premium.
For installers and long-term owners, scalability usually wins over design-only optimisation.
FINAL VERDICT
Simpson & Partners is the better long-term investment.
It delivers:
More reliable connectivity
Greater flexibility
Higher durability
And significantly more future-proofing
The Andersen A2 is a strong choice for design-focused buyers, but it’s ultimately more limited in capability.
👉 If you want a charger that continues to work for you as your home evolves — Simpson & Partners is the clear winner.
FAQ's
Do I need a separate consumer unit or distribution board for an EV charger?
Do I need a separate consumer unit or distribution board for an EV charger?
In many cases, yes. A dedicated circuit is required for EV charging, and depending on the installation, you may need a separate consumer unit or EV-specific distribution board with appropriate protection such as RCBOs, surge protection, and PME fault detection.
Do I need load balancing for my EV charger?
Do I need load balancing for my EV charger?
Load balancing is recommended if your property has limited electrical capacity or if you plan to install multiple chargers. It ensures the total electrical demand does not exceed your supply limit, preventing overloads. This is especially important in commercial or multi-EV environments.
What’s the difference between single-phase and three-phase EV charging?
What’s the difference between single-phase and three-phase EV charging?
Single-phase chargers (typically 7kW) are common in residential homes, while three-phase chargers (up to 22kW) are used in commercial or high-demand environments. Three-phase setups allow faster charging and better support for multiple vehicles, but require the appropriate electrical supply and distribution equipment.
Can I install a Simpson & Partners charger without an earth rod?
Can I install a Simpson & Partners charger without an earth rod?
In most cases, yes. Simpson & Partners chargers typically include built-in PEN fault protection, meaning an earth rod is not required for standard UK PME (TN-C-S) installations. This can reduce installation complexity and cost.
| Feature | Simpson & Partners | Andersen A2 |
|---|---|---|
| Primary Focus | ✔ Future-proof smart charging, flexibility & system integration | ⚠ Design-led premium home charging with hidden cable aesthetic |
| Solar Integration | ✔ Advanced solar + load balancing integration | ✔ Solar compatible via smart tariff integration |
| Connectivity | ✔ WiFi + Ethernet + Bluetooth (model dependent) | ⚠ WiFi-based (cloud dependent functionality) |
| OCPP Support | ✔ Yes (open platform ready) | ✖ No |
| Smart Features | ✔ Advanced load control, integrations, V2G roadmap | ⚠ Strong app control, limited extensibility |
| Load Management | ✔ Advanced wired & multi-unit load balancing | ✔ Built-in load management |
| Installation Flexibility | ✔ Wall or freestanding pedestal options | ⚠ Wall-mounted only (hidden cable design focus) |
| Design & Aesthetic | ✔ Minimal architectural design, multiple finishes | ✔ Premium hidden cable “furniture-like” design |
| Repairability | ✔ Modular & serviceable design | ⚠ Limited modular repairability |
| Future-Proofing | ✔ Designed for upgradeability (incl. V2G path) | ⚠ Limited long-term upgrade pathway |
| Connectivity Reliability | ✔ Ethernet fallback option available | ⚠ Cloud-reliant architecture (no wired fallback) |
| Warranty | ✔ Up to 5–10 years (hardware/enclosure dependent) | ✔ 7-year warranty |
| Best For | ✔ Future-focused homes, multi-site installs, flexibility | ⚠ Design-first users prioritising aesthetics and cable concealment |
EV Charger Comparisons & Guides
Simpson & Partners vs Zappi V2
Compare solar-first charging vs a full system-level EV charging approach designed for long-term flexibility.
Simpson & Partners vs Ohme Home Pro
Smart tariff optimisation vs integrated hardware design — which delivers better long-term value?
Simpson & Partners vs Andersen Quartz
Premium aesthetics vs installation efficiency and system flexibility for UK homes.
Simpson & Partners vs Hypervolt Home 3 Pro
App-first simplicity vs scalable, future-ready EV charging system design.
Simpson & Partners vs Andersen A2
High-end design engineering vs modular, installer-friendly system architecture.
Freestanding vs EV Tower Pedestal
Integrated freestanding charging systems vs generic pedestal mounting solutions.
Simpson & Partners Key Features
Explore the system-level engineering behind safer, smarter and more future-ready EV charging.